Short Lead Time for Steel Structure Warehouse Design Pdf - Low Cost Fast Assemble Portable Factory Steel Frame Warehouse – Hongji Shunda
Short Lead Time for Steel Structure Warehouse Design Pdf - Low Cost Fast Assemble Portable Factory Steel Frame Warehouse – Hongji Shunda Detail:
1) Main Steel: Q345, Q235,etc.
2) Column & Beam: Welded or Hot rolled H-section
3) Connection method of steel structure: welding connection or bolt connection
4) Wall & Roof: Class wool fiber,EPS, Rock wool fiber, PU sandwich, corrugated steel sheet
5) Door: Rolled up door or Sliding door
6) Window: Plastic steel or Aluminum alloy window
7) Surface: Hot dip galvanized or painted
8) Crane: 5MT, 10MT, 15MT and more
Drawings & Quotation:
1) Customized design is welcomed.
2) In order to give you an exactly quotation and drawings, please let us know length, width, eave height and local weather. We will quote for you promptly.
Characteristics
1. Wide span: single span or multiple spans, the max span is 36m without middle column
2. Low cost and maintenance: unit price range from USD30/m2 to USD65/m2 according to customers request
3.Fast construction and easy installation: time saving and labor saving
4.Long using lifespan: up to 50 years
5. Nice appearance
6. Others: environmental protection, stable structure, High quake-proof, water proof and fire proof, and energy conserving。
Design Requirements
Multi-span Easy Install Steel Structure Garment Warehouse Basic Design Requirements: design Load: (very important)
1.Snow load: 2. Wind load: 3. Seismic magnitude: 4. Middle Column allowed or not: 5. Project location: 6. Length (side wall, m): 7. Width (end wall, m): 8. Wall Height (eave, m): 9. Mezzanine or not?
And usage: Building Purpose: we will recommend the best design for the purpose of the building
A. Warehouse/Storage B. Factory C. Agriculture Barn D. Retail Store E. Repair/Mechanic Shop F. Office Space G. Medical Warehouse H. Animal Farm (please confirm what kind of animal)
Product detail pictures:





Related Product Guide:
A6A constructs self-contained 20 sqm prefab cabin in southwest france | Prefab Workshop
Bivouac Luca Pasqualetti at Morion / Roberto Dini + Stefano Girodo | China Steel Structure Warehouse
Sticking for the principle of "Super Quality, Satisfactory service" ,We have been striving for being a superb small business partner of you for Short Lead Time for Steel Structure Warehouse Design Pdf - Low Cost Fast Assemble Portable Factory Steel Frame Warehouse – Hongji Shunda , The product will supply to all over the world, such as: Algeria , Thailand , Iceland , Our company has a skillful sales team, strong economic foundation, great technical force, advanced equipment, complete testing means, and excellent after-sales services. Our products have beautiful appearance, fine workmanship and superior quality and win the unanimous approvals of the customers all over the world.

The company has rich resources, advanced machinery, experienced workers and excellent services, hope you keep improving and perfecting your products and service, wish you better!
