The types of steel structure engineering work include: Lofter, sheet metal worker (or cold worker), welder, fitter, rigger, scaffolder, sheet metal worker (or cold worker), welder. 

steel structure installation project is mainly made of steel structure, which is one of the main types of building structure.Guiyang steel structure is one of the common structural forms in modern construction engineering. 

Organize technical personnel to prepare the construction organization design of steel structure installation and submit it to the supervising engineer for confirmation and signature.Make the labor force deployment plan and mechanical equipment supporting plan before construction, and check whether the access road for steel structure materials is smooth before entering the site.Plan the material mobilization plan.

Steel structure installation

   Deployment of temporary facilities.The management team enters the site and organizes the labor force to enter the site, completes the handover procedures with the civil engineering, requires the civil engineering party to provide the baseline, and signs after the inspection and confirmation of both parties.Lay out and level the foundation and correct the levelness.Enter the normal construction procedure.

   The required personnel include professional steel structure constructors, professional technicians, professional quality inspectors, professional safety officers, surveyors, riveters, riggers, fire and electric welders (it is better to master submerged arc welding and co welding at the same time).Lifting, fire and electric welding shall be provided with special type of work operation certificate, and riveter shall be provided with drawings that can be disassembled and lofted separately, so as to facilitate inspection and recheck by technical personnel.