What are the factors that affect the contract price of steel structure project?

What are the factors that affect the contract price of steel structure project?

With our country’s steel production has been increasing, many people will choose steel structure when building factories, so now the application of steel structure engineering is more and more widely, with the increasing demand, the market is also growing, which leads to a lot of steel structure project contract price is very different, for non insiders, it is really do not know How to make the choice, today’s small series will take you to understand what factors affect the steel structure project contract price 

1.The main body of the workshop is the frame composed of steel structure, which accounts for about 70% – 80% of the total cost of the steel structure project. The fluctuation of the market price of the raw materials of the steel structure directly affects the cost of the steel structure project.There are also big differences in the price of the material and load surface of the section steel and the material and thickness of the enclosure plate.The raw material of steel structure is the main factor affecting the cost of steel structure engineering. 

2.The design of steel structure engineering is also a large part of the factors that directly affect the price. The design of steel structure engineering scheme is designed by professional designers, so as to make the plant scheme reasonable.Reasonable design is the fundamental problem of saving raw materials and controlling the cost of steel structure engineering.Different steel structure engineering design scheme is an important reason for the change of raw material quantity, which directly affects the total cost of steel structure engineering.Through the design of steel structure project by professional designers, we can choose materials and make reasonable budget, so that the design of the whole scheme can be rationalized as far as possible, and the cost of the workshop can be effectively controlled.  

3.The construction factor is the labor cost and the influence factor of the installation quality of the whole structure. The length of the construction period is a part of the factor affecting the steel structure engineering cost, and the skilled installation technology is the main reason for the length of the construction period.The construction of steel structure engineering is a systematic project, which has a wide range of design, many influencing factors, construction period, engineering quantity and other issues are the factors affecting the cost of steel structure engineering.Choose a professional engineering company, provide professional installation and construction team, for you to build high-quality steel structure engineering, but also can save cost and speed up the construction period. 

  The above is the impact of the steel structure contract price of the reasons, today’s small editor here, want to know more information, welcome to visit our website for detailed understanding.


Post time: Jul-10-2020