Implementation and inspection of construction schedule of steel structure engineering

Implementation and inspection of construction schedule of steel structure engineering

1.Implementation of construction schedule of steel structure engineering

 

steel structure engineering construction project department shall continuously prepare monthly (ten day) operation plan before and during the construction in combination with the actual construction situation and progress on site, and define the construction tasks to be completed.In this month (ten days) the amount of resources needed and the completion of the plan, thereby improving labor productivity.The preparation of subproject operation plan shall ensure the balance and coordination of simultaneous construction among different projects; determine the implementation plan of construction project schedule by stages; and clarify the schedule requirements of construction project decomposition.The Contractor shall carry out comprehensive balance on the basis of each project schedule, prepare year-end and quarter end plans, dynamically combine the construction production factors of each project, and optimize the allocation.According to the inspection plan at all levels, the construction schedule tasks are assigned to component manufacturers, material suppliers, contractors and construction teams respectively in the form of contracts.Among them, the contractor and component manufacturer, material supplier, project manager, contractor and functional department, contractor and operation team (such as installation, measurement and welding workshop) shall sign respectively.Contract.The main task of construction scheduling is to supervise and inspect the implementation of the plan, organize scheduling meetings regularly, coordinate the cooperation of all parties, eliminate contradictions in the construction, strengthen weak links, achieve dynamic balance, and ensure the realization of the operation plan and progress control objectives.Yes.

 

In the process of steel structure project implementation, the implementation personnel of construction schedule at all levels shall record the construction records truthfully, record the start date, work process and completion date of each work in the process of plan implementation, and provide true and accurate original data for inspection.Implementation, analysis, adjustment and summary of construction schedule.In addition, before and during the implementation of the steel structure project, various interference factors that may cause the project implementation result to deviate from the progress shall be predicted according to various data and data, and measures shall be taken in advance to adjust the possible deviation as soon as possible.

 

2.Steel structure construction progress inspection

 

In the construction process of steel structure engineering, the inspection time is related to the work type (such as steel component manufacturing, steel component installation, etc.), scale, schedule execution requirements, etc.Daily inspection shall be conducted by the resident manager, and construction records and logs shall be recorded.The general contracting project department, together with the general contractor, the supervisor and other relevant parties, shall regularly inspect the construction progress of the project (monthly, 10th and weekly) by holding on-site meetings.When collecting the actual progress data of steel structure construction, the statistics shall be made according to the work items controlled by the plan to form the size and image progress data compared with the planned progress.

 

In general, the actual inspection data can be sorted and counted according to the actual workload, workload, labor consumption and its cumulative percentage, so as to compare with the corresponding planned completed quantity.Control report shall be formed for the results of steel structure construction progress inspection, and the results of inspection and comparison, construction progress status and development trend shall be provided to the business functional heads at all levels of the general contracting project department.The progress report mainly includes: project implementation overview; management overview; progress outline; project construction progress; visual progress and brief description; construction drawing provision progress; material supply progress; steel component production progress; labor record and forecast; owner, general contractor, design, construction, supervision, supervision, supervision, supervision, etc.Check the steel structure construction change instructions.In principle, the person in charge of the plan or the progress manager shall be responsible for the preparation of the progress report, with the assistance of other project managers.The reporting time is usually coordinated with the planned inspection time.