Construction process and quality inspection after completion of steel structure engineering

Construction process and quality inspection after completion of steel structure engineering

Steel structure installation engineering in the construction process problems, will bring many aftereffects, light impact on the construction period, damage the appearance of the structure, waste materials, etc., serious will cause casualties, and even cause adverse effects for society.Therefore, the quality of steel structure installation must be strictly controlled to prevent accidents. 

  

1、 Steel structure project construction quality control process of three-dimensional small preparation for you to prepare a construction quality control chart, in each link need to pay attention to, there are detailed explanation, only strictly control each need to control the point, also afraid of our project quality problems?Three dimensional small editor is willing to work with you to create a high-quality project in the construction industry.After the completion of the steel structure project, the project management personnel take the acceptance form to go to the customer for acceptance. Many customers will put forward that they don’t understand and don’t know how to check and accept. Whether the project is safe or not can’t be seen. In view of these problems, today’s three-dimensional editor will share with you some items and methods of quality inspection after the completion of steel structure construction Steel structure installation after the existence of detection problems, the following is a brief introduction to the very common detection methods, although simple, but can detect many problems, is a very common detection method for many owners.1. The steel structure after installation shall be free from leakage, ponding, and no obvious fold of color steel plate.Test method: visual inspection, natural water spraying or local water spraying test.2. The repair of damaged steel (H-shaped steel and C-shaped steel) in the steel structure after installation shall meet the requirements.Test method: visual inspection.3. The connection joints of column and steel beam shall meet the design requirements, and there shall be no falling off and broken welding of the joint between steel and steel, and there shall be no shelling and peeling at the thermal fusion bonding joint.Test method: manual detection.4. All connectors and fasteners shall meet the design requirements.Test method: manual detection.5. Whether the steel beam has been treated with antirust and the gutter is rusty 


Post time: Aug-05-2020